At that time we started operating a small power plant. It was a museum piece even then, let alone now. It had been made in 1917. And we got some 160 kilowatts out of that plant, which was enough to supply one hospital, i.e. that which was most needed in the hospital.
| ID | FC-VOH-99-314 |
| Project | Oral History: ‘The Siege of Sarajevo 1992-1996’ |
| Period | December 1992 |
| Headline | FUNCTIONING OF THE ELECTRICAL SYSTEM |
| Topic | Light / Lamps / Electricity History Heritage / Architecture Hospitals / Medical Care / Wounded / Patients |
| Location | Elektroprivreda building / electricity company |
| Name | Irfan Durmić |
| Sex | male |
| Profession | Director of the Electric Company |
| Copyright | © FAMA Collection; Oral History: 'The Siege of Sarajevo 1992-1996' |